Commercial Paving
We provide full paving services to businesses, builders, contractors,
shopping centres, institutions, apartment complexes, organizations, and more.

The commercial Paving process differs from the residential process, as these areas need to endure a heavy traffic flow. Every paving process is unique to what the customer wants to achieve. From new asphalt, an overlay, repairs and patching, to cement stabilization
We are dedicated to delivering the best possible results to every client, results that we are proud to stand behind. By producing our own asphalt and aggregates, we control the quality of products we use. Your project will always be of superior grade and reliability. With years of experience with paving and construction, we strive to excellence in all aspects of our industry. Call us today at (780) 826-4774 for a free evaluation and quotation.
Our Services
- Commercial Paving & Maintenance
- Parking Lot Paving / Parking Lot Construction
- Construction Site Design & Paving
- Road Paving
- Parking Lot Overlay
- Subdivision Paving
- Bike & Pedestrian Paths
- Asphalt Repairs
- Line Painting & Curb Installation
- Access Road Paving
- Gravel Work
- Soil Stabilization
To learn more about our commercial paving services, call (780) 826-4774 to speak to a project manager now or Request a Free Quote.
The Process
A professional estimator of Elevated Surface Works will survey the proposed area, assess its soil condition, stability, elevation and any water drainage issues. We will then be able to issue recommendations towards the work to be completed.
NEW PAVEMENT CONSTRUCTION
Depending on the soil content, any clay or inappropriate material will be excavated and the area will be backfilled and compacted with new aggregate. If the soil already has a solid gravel base, appropriate compaction will be achieved.
Once the base work completed, the surface will be paved using 75-150mm of hot-mix asphalt (depending on traffic flow and weight) and compacted to proper standards.
RESURFACING
At first, we will determine if the existing pavement surface has deteriorated due to its age, poor base condition or poor prior concrete and asphalt application.
Clay, dirt and high moister in the soil will involve some base work is completed prior to paving. Once any base work completed, the surface will be cleaned and a bonding agent will be applied to the existing pavement. The surface will be paved using 50-100mm of hot-mix asphalt (depending on traffic flow and weight) and compacted to proper standards.