Cement Stabilization

We provide the appropriate cement mixture for a perfect solid surface.

Stabilize Cement

Even with the appropriate application, a pavement surface is only as good as its sub-grade underneath. The sub-grade soil serves as a working platform to support construction equipment, as well as the foundation of the pavement. Because it will carry the loads transmitted to it from the pavement structure, it is important that the sub-grade be properly graded and compacted.

We provide the appropriate subgrade preparation for pavement surfaces. Pavement surfaces are only as good as the subgrade underneath. The sub-grade serves as a working platform, as well as the foundation of pavement.

 

It will carry loads transmitted to it from the pavement structure. It is important that the sub-grade be properly graded and compacted. Elevated Surface Works provides grading and subgrade prep prior to asphalt paving. Rough grading includes cutting, scarifying and compacting a site to prepare for a construction project.

 

During rough grading spaces are excavated and back filled and the site is configured for proper drainage. In the final step the drainage is perfected and final compaction is achieved. Cement stabilization is recommended for high plasticity clay content, and high water table, to ensure long lasting pavement surfaces. As a knowledgeable paving contractor, Elevated Surface Works will survey your proposed project, consult plans, anticipate problems, and suggest solutions. Call us today at (780) 826-4774 for a free evaluation and quotation.

Our Services
To learn more about our commercial paving services, call (780) 826-4774 to speak to a project manager now or Request a Free Quote. 

The Process

A professional estimator of Elevated Surface Works will survey the proposed area, assess its soil condition, stability, elevation and any water drainage issues. We will then be able to issue recommendations towards the work to be completed.

SUB-GRADE PREP & CEMENT STABILIZATION

In order to provide a solid subgrade for paving, the clay content must be engineered fill capable of supporting vehicle loads. Cement Stabilization might be required depending on the type of clay and application of the pavement surface. Therefore, depending on the application (residential, commercial, industrial, municipal), we will scarify the subgrade to achieve proper moisture content and ensure maximum compaction. The surface will be final graded to ensure proper drainage.